Menu
Your Cart

HOMA2u now offers free shipping to selected states in Malaysia! No minimum orders.

Mui Fatt Sewage Tank MF 3 ( 15 PE )

Mui Fatt Sewage Tank MF 3 ( 15 PE )
Mui Fatt Sewage Tank MF 3 ( 15 PE )
RM4,550.00
Ex Tax: RM4,550.00
Price in reward points: 455000
  • Availability: 50 left
  • Quantity per unit: 1
  • Minimum Purchase Quantity: 1
  • Brand Mui Fatt
  • Model: MF 3
  • Weight: 100.00kg

(Please "Contact Hommie" to double confirm the stock availability before confirming the purchase.)

Product Details:


The “MF” PE Septic Tank system is a High Density Polyethylene (PE) based on a septic tank and upward flow anaerobic biofilm system, the latter representing the biological treatment element in the overall process.

These septic tanks are made of High Density Polyethylene (HDPE) and manufacture by roto-molding process at our manufacturing facility in Telok Gong, Klang, Selangor Darul Ehsan. The septic tanks are generally in the form of vertically/horizontally-mounted indent cylinder with varies standard diameter and length.

PE Septic tanks is designed to offer treatment process as conventional septic tank / filter bed system as specified by the Department of Standards Malaysia and National Water Services Commission (SPAN) in accordance to Malaysian Sewerage Industry Guidelines (Volume 5)-Septic tanks to achieve treatment ability of Standard “B” effluent in-line with
Environmental Quality (Sewage) Regulations, 2009.

The “MF” PE Septic Tank used mainly treated medium and low risk sewage up to capacity of 18PE for residential and commercial buildings such as shop offices, small/medium industry factories and warehouse as well as for use in temporary installations in construction sites.

Our septic tank has complied in accordance to Malaysian Standard (MS2441-1:2012) and the brand is certify with Product certification scheme conducted by SIRIM Qas International Sdn. Bhd. approved and listed by National Water Services Commission (SPAN).



Terms and condition

1. Goods sold are not returnable and refundable.

2.Upon confirmation of order, item(s) will be scheduled for delivery and will typically require a minimum of 7 up to 14 business days for item(s) arrival. 

3. No unloading service included.

4. Goods condition must be verified within 3 days.

Write a review

Note: HTML is not translated!
Bad Good